All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Repair or replace broadcast equipment |
SAQA US ID | UNIT STANDARD TITLE | |||
115041 | Repair or replace broadcast equipment | |||
ORIGINATOR | ||||
SGB Audio-visual Media Production | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 04 - Communication Studies and Language | Communication Studies | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 5 | Level TBA: Pre-2009 was L5 | 10 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2026-06-30 | 2029-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard will be essential to technically skilled people who work in the broadcasting environment and need to use sophisticated methods and equipment to install, set-up, operate and fault find professional broadcast equipment. Learners would be able to do first line maintenance of broadcast equipment within systems as opposed to equipment that can be maintained in a workshop.
People credited with this standard will be capable of: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The credit value is based on the assumption that people starting to learn towards this unit standard already understands:
And are already competent in: |
UNIT STANDARD RANGE |
Specific range statements are provided in the body of the unit standard where they apply to particular specific outcomes or assessment criteria. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan fault finding activities. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Fault finding activities are planned to cause minimum disruption to the workflow. |
ASSESSMENT CRITERION 2 |
Materials, equipment and tools needed for the fault finding activities are obtained in accordance with the employer's procedures. |
ASSESSMENT CRITERION 3 |
Fault finding methods and procedures are explained and described in terms of their effectiveness. |
ASSESSMENT CRITERION 4 |
All relevant information for diagnostic purposes are identified and located. |
ASSESSMENT CRITERION RANGE |
Equipment manuals, operational requirements, manufacturer's support data, system interconnection information, specified loads, user fault report and previous history of equipment. |
ASSESSMENT CRITERION 5 |
A fault and job card is prepared for every operational complaint. |
SPECIFIC OUTCOME 2 |
Diagnose faults in broadcast equipment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Fault diagnoses is carried out systematically using the most appropriate diagnostic techniques. |
ASSESSMENT CRITERION RANGE |
Comparison of measured readings against specifications, comparison of results against past performance in the same piece of equipment, operational checks against normal operating specifications or comparison of results against similar pieces of equipment or systems. |
ASSESSMENT CRITERION 2 |
Faults are isolated to specific equipment or parts of equipment to board level. |
ASSESSMENT CRITERION RANGE |
Audio, video, data and communications or RF. |
ASSESSMENT CRITERION 3 |
The test/measurement equipment/techniques are used effectively and in accordance with their design. |
ASSESSMENT CRITERION RANGE |
Multimeter, automatic measuring equipment, video waveform monitor, test signal generator, computer, oscilloscope, audio test set, digital analysis equipment or RF measurement test set. |
ASSESSMENT CRITERION 4 |
Diagnosed problems and faults are interpreted accurately and repairs or adjustments determined. |
SPECIFIC OUTCOME 3 |
Diagnose faults in broadcast system. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Fault diagnoses is carried out systematically using the most appropriate diagnostic techniques and drawings. |
ASSESSMENT CRITERION 2 |
Faults are isolated to specific equipment or parts of equipment to board level. |
ASSESSMENT CRITERION RANGE |
Audio, video, data and communications or RF. |
ASSESSMENT CRITERION 3 |
The test/measurement equipment/techniques are used effectively in accordance with their design. |
ASSESSMENT CRITERION RANGE |
Multimeter, automatic measuring equipment, video waveform monitor, test signal generator, computer, oscilloscope, audio test set, digital analysis equipment or RF measurement test set. |
ASSESSMENT CRITERION 4 |
Diagnosed problems and faults are interpreted accurately and quickly and minimizing the downtime of the production. |
ASSESSMENT CRITERION RANGE |
Board changes, basic adjustments, by-passing the fault or equipment changes. |
SPECIFIC OUTCOME 4 |
Repair or replace broadcast equipment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
All the replacement equipment is obtained, is in suitable condition for replacement and meet required technical specifications. |
ASSESSMENT CRITERION RANGE |
Audio, video, data and communications or RF. |
ASSESSMENT CRITERION 2 |
The equipment is repaired (replaced) in an agreed timescale, using appropriate tools and techniques. |
ASSESSMENT CRITERION RANGE |
Audio/video heads, motor or motor assembly, power supply, CRT or display. Printed circuit assembly, storage media drive, switch/keypad assemblyor audio/vision mixer component. |
ASSESSMENT CRITERION 3 |
The test/measurement equipment/techniques are used effectively in accordance with their design. |
ASSESSMENT CRITERION RANGE |
Multimeter, automatic measuring equipment, video waveform monitor, test signal generator, computer, oscilloscope, audio test set, digital analysis equipment or RF measurement test set. |
ASSESSMENT CRITERION 4 |
Systems/equipment are critically tested and assessed for satisfactory performance. |
ASSESSMENT CRITERION RANGE |
Critically tested against manufacturer's data/specifications, company specific performance criteria and/or relevant industry. |
ASSESSMENT CRITERION 5 |
The settings and adjustments to the equipment ensure optimal functioning. |
ASSESSMENT CRITERION 6 |
The removal and replacement procedures are according to company procedures and/or manufacturer's instructions. |
SPECIFIC OUTCOME 5 |
Comply with workplace health & safety requirements when repairing or replacing broadcast equipment. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Safe access and working arrangements is planned for the fault finding activities. |
ASSESSMENT CRITERION 2 |
Precautions are taken to avoid damage to components, tools and equipment. |
ASSESSMENT CRITERION 3 |
Waste and debris is removed from work site and dispose of in accordance with environmental requirements. |
ASSESSMENT CRITERION 4 |
Maintenance is carried out safely at all times, complying with the relevant heath and safety regulations and guidelines. |
ASSESSMENT CRITERION 5 |
Tools and equipment are cared for and stored as per worksite practice. |
ASSESSMENT CRITERION 6 |
Potential health hazards are correctly identified and action appropriate for the context is taken. |
ASSESSMENT CRITERION RANGE |
Action can include removal, reduction and/or reporting. |
SPECIFIC OUTCOME 6 |
Report and feedback on repair or replacement activities. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Repair or replacement records or any other relevant documentation are accurate, complete and filed in accordance with company requirements and procedures. |
ASSESSMENT CRITERION RANGE |
Details of activities undertaken, measurements, diagnostic and test results, items repaired and items that need further work. |
ASSESSMENT CRITERION 2 |
Where maintenance activities cannot be met fully or where defects that were identified fall outside the planned activity, they are reported to the relevant person. |
ASSESSMENT CRITERION 3 |
Reporting procedures are explained in terms of effective reporting and the extend of own responsibilities when feedback is given to line management. |
ASSESSMENT CRITERION 4 |
Clients are informed of problems and solutions on completion of the job. |
SPECIFIC OUTCOME 7 |
Solve problems related to repairing and replacing equipment. |
OUTCOME RANGE |
Technical, work related, tangible or conceptual problems. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Potential equipment repair or replace problems are identified and evaluated for impact. |
ASSESSMENT CRITERION 2 |
Appropriate responses are formulated to deal with potential equipment repair or replace problems effectively. |
ASSESSMENT CRITERION 3 |
Technical equipment repair or replace problems are identified, diagnosed and solutions formulated that are appropriate and effective. |
ASSESSMENT CRITERION RANGE |
Tangible and conceptual problems within own area of responsibility, standard or non-standard procedures. |
ASSESSMENT CRITERION 4 |
Problems that cannot be resolved are reported to relevant persons. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
Moderation Option: |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Essential embedded knowledge will be assessed through assessment of the specific outcomes in terms of the stipulated assessment criteria. Candidates are unlikely to achieve all the specific outcomes, to the standards described in the assessment criteria, without knowledge of the listed embedded knowledge. This means that for the most part, the possession or lack of the knowledge can be directly inferred from the quality of the candidate's performance. Where direct assessment of knowledge is required, assessment criteria have been included in the body of the unit standard.
The following embedded knowledge is addressed in an integrated way in the unit standard: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems and make decisions using critical and creative thinking to take remedial action. |
UNIT STANDARD CCFO WORKING |
Work effectively with others (clients and colleagues) as a member of a team, group, organisation to achieve the required end-result. |
UNIT STANDARD CCFO ORGANISING |
Organise and manage themselves in the work areas and their activities responsibly and effectively to complete tasks within deadlines. |
UNIT STANDARD CCFO COLLECTING |
Collect and analyse engineering information and critically evaluate the effect of this on work performance. |
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively (with clients and colleagues), using visual and / or language skills. |
UNIT STANDARD CCFO SCIENCE |
Use science and technology (broadcast equipment) effectively and critically showing responsibility towards the environment (work areas and venues) and health of others (clients and colleagues). |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding that the engineering world is a set of related systems and that problem-solving does not exist in isolation. |
UNIT STANDARD ASSESSOR CRITERIA |
Assessors should keep the following principles in mind when designing and conducting assessments against this unit standard:
|
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
N/A |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 48792 | Certificate: Broadcast Engineering | Level 5 | Level TBA: Pre-2009 was L5 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MICTS |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | Facilitation Development (PTY) LTD |
2. | HILLCROSS BUSINESS SCHOOL (PTY |
3. | OPELONG BUSINESS INSTITUTE (PT |
4. | SUPREME ICT CONSULTANTS |
5. | Varsity Institute of Science & Technology (Pty)Ltd |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |